40 MW Utility Power Station Delivered Ahead of Schedule

Guinea Flag
Asperbras & EDG Logo

THE CHALLENGE

The utility power station in Guinea, with installed generation capacity at just over 550 MW, only 26% of Guineans have access to reliable energy, dropping to just 11% in rural areas. Electricity distribution under EDG suffers from weak governance, aging infrastructure, poor maintenance, frequent blackouts, high theft rates, and poor financial performance. Guinea needed new utility-scale generation capacity to strengthen national electricity supply.

The Solution

USP&E delivered a 40 MW HFO power station featuring four MAN 18V32/40 engines operating on medium fuel oil (RME180). We led full project execution, including engineering, design, procurement, construction, and commissioning, acting as the single point of technical accountability throughout the project lifecycle.

The Outcome

The project was completed in 10 months and commissioned 2 months ahead of schedule, on budget. The new power station improved electricity availability and grid reliability for the region.

Utility power station in Guinea completed for EDG

Client Reference

“We hereby congratulate USP&E for excellence in engineering, design, procurement, construction and commissioning of our new 40 MW HFO power plant in Conakry, Guinea, West Africa. We are satisfied with the quality of our equipment and pleased with the service from USP&E.” – EDG Client

Built for the Frontier

This project demonstrates Grit and Together in action: USP&E delivered utility-scale power infrastructure in a challenging frontier environment, ahead of schedule, to improve energy access for a nation. Entrepreneurial speed. Engineering credibility. That is what Powering Precision means.