Case Studies: Engineering and Project Execution

Emergency power rental with GE TM2500 turbines

50 MW Emergency Power Rental Deployed Within Weeks

Togo Flag
West African Power Group Logo

THE CHALLENGE

Togo faced a major power crisis following reduced electricity imports from Ghana and limited gas deliveries from Nigeria, resulting in widespread blackouts and production losses. The national grid was unable to meet rising demand, and traditional infrastructure expansion would have taken years to deliver results. The country needed a fast, affordable, and scalable solution that could strengthen the network and ensure long-term energy reliability.

The Solution

WAP&G sought an experienced partner, and USP&E was chosen for its proven ability to mobilise quickly, deliver dependable power solutions, and operate in challenging environments. USP&E supported the deployment of two TM2500 mobile gas turbines under a rental model. Leveraging global stockholding and logistics capabilities, the units were mobilised, installed, and commissioned within weeks. The use of refurbished, high-performance equipment reduced costs, while a 3 to 5 year O&M contract ensured long-term reliability and operational peace of mind.

The Outcome

Within weeks, 50 MW of reliable power was restored to Togo’s grid, stabilising the network and reducing outages. The programme provided the utility with immediate relief while longer-term capacity solutions were developed separately.

Emergency power rental with GE TM2500 turbines deployed in Togo

Client Reference

“USP&E Global demonstrated exceptional speed, professionalism, and technical expertise” – WAP&G Client

Built for the Frontier

This project demonstrates Agility and Grit in action: USP&E deployed 50 MW of emergency power within weeks to stabilise a nation’s grid during a crisis. Entrepreneurial speed. Engineering credibility. That is what Powering Partnership means.