Cement factory power station in Iraq

40 MW Cement Factory Power Station Delivered Fast-Track

Iraq Flag
Oman Reliable Energy Logo

THE CHALLENGE

A major cement factory in Mosul, Iraq required a 40 MW HFO power station upgrade on a fast-track basis. Cement production was behind schedule due to energy shortages. Global manufacturers were quoting 12 to 18 months for new medium-speed HFO engines, a timeline the client could not afford.

The Solution

USP&E deployed a team within days of the request to perform a factory acceptance test and then began work on designs, engineering, logistics, and next steps. With new HFO power station engines and auxiliaries already in stock, USP&E was able to deliver the exact solution the client needed with world-class engine efficiencies. We rapidly shipped the MAN 18V32/40 engines and auxiliary equipment to site.

The Outcome

The project was delivered on time, enabling the restart of cement production and supporting industrial recovery in the region.

Cement factory power station with MAN engines in Iraq

Client Reference

“ORE needed professional expertise with our project and USP&E delivered beyond our expectations”  – Oman Reliable Energy Client

Built for the Frontier

This project demonstrates Agility and Grit in action: USP&E responded within days and delivered a 40 MW power station when global lead times would have taken over a year. Entrepreneurial speed. Engineering credibility. That is what Powering Precision means.